Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • North East UK’s A19 /A1058 Coast Road triple-deck junction opens
    April 5, 2019
    More than 80,000 drivers a day are now using the recently opened and - first ever - North Tyneside triple-deck highway junction in the northeast. England’s A19 /A1058 Coast Road junction improvement scheme, being done for the client Highways England, was opened on time. However, there will be some overnight closures in the next several weeks to complete the landscaping, traffic light and footpath work. A time capsule has been buried on site and is due to be opened in 2118. Work started in June 2016 on
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.