Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • Colas eases congestion with new Thornbury Barracks roundabout
    April 27, 2015
    In the UK, Colas is near completion of the Thornbury Barracks roundabout aimed to reduce traffic congestion on the A647 highway, the principal link between Leeds and Bradford in the county of West Yorkshire. Traffic signals have been placed on the junction, with central running lanes constructed through the previous roundabout. Michael Holmes, Colas business manager for the Leeds area, explained there was a need to infill a local pedestrian subway underpass using foam concrete, and option not previously u
  • Crack infill system ideal reinstatement solution
    February 17, 2012
    Overnight repair work on a major English motorway has avoided the major traffic disruption and significantly increased road surfacing costs that would have occurred if left untreated.