Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • Inrix Analytics announced
    May 4, 2012
    Inrix has introduced what it claims is the industry's first cloud-based data analytics services designed to improve how transportation agencies monitor, manage and measure the performance of their road networks. "Now more than ever, government agencies worldwide are being required to stretch and justify every dollar invested in transportation - being asked to do more with less," said Rick Schuman, Inrix VP of public sector.
  • Crushing and screening for producing and re-using
    July 23, 2012
    The recycling and minerals extraction markets now share technologies, Mike Woof reports Not surprisingly, the Steinexpo quarrying event in Germany was a key launch venue for new crushing and screening technologies, as well as associated quarrying technology. Crushing and screening equipment firms from a wide range of European countries including Austria, the Czech Republic, Germany, Ireland, Italy, Sweden, Switzerland and the UK were present at the exhibition. However it was noticeable how closely the miner
  • Major fleet
    February 6, 2012
    POLAND'S new A1 highway is the country's biggest road project at present and when complete, it will run 568km north to south from Gdansk to Gorzyczki, cutting the journey time from 10-6 hours. The project is a key one for Poland's economy and the highway will provide a vital new link for cross-country truck transport. This route forms part of the Trans-European Transport route connecting Norway with Greece, and work started in October 2005 on the first 100km phase, which was
  • Traffic Data Systems WiM for Köhlbrand Bridge
    April 4, 2025
    A weigh-in-motion, WiM, system from Traffic Data Systems is set for the Köhlbrand Bridge across the River Elbe in Hamburg, northern Germany.