Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • Capita Symonds wins key UK contract for traffic information
    April 4, 2012
    Capita Symonds’ Innovations has a new contract that forms part of the Highways Agency Traffic Information System (HATRIS) programme. The contract is an extension to the company’s current HATRIS work and will run until 12th December 2014. The HATRIS system has been developed and improved by Capita Symonds since 2005 and is used to monitor and report on vehicle journey times across set routes on the motorway and trunk road network. This enables the Highways Agency and Department for Transport to identify tren
  • Nepal's highway plans
    March 22, 2012
    The Nepalese Government is working on plans to build a series of highways that will improve north-south connectivity for this mountainous country.
  • Researchers trial 3D printing for both concrete and asphalt roads
    February 27, 2019
    Automated road repairs, using 3D printing, could save money and vastly reduce disruption, and researchers are already showing it’s possible - Kristina Smith reports It’s the middle of the night, and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.