Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Improvements for UK road link
    February 27, 2023
    Improvements are planned for an important UK road link.
  • Growth in asphalt testing equipment
    February 21, 2012
    The building of Italy's highway system just over four decades ago led to the formation of a testing equipment company. It is now among the world leaders. Just over 40 years ago a big surge in construction of the Italian highway system presented an opportunity to a team of local entrepreneurs.
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti