Skip to main content

Tesmec’s ‘Trenchtronic’ technology takes trenchers towards full automation

Tesmec has developed new technology for its range of trenchers, which makes its machines ‘almost automatic’, according to business development director Paolo Celeri. ‘Trenchtronic’ allows the trenchers to self-adjust the engine load and travelling speed, depending on the soil type.
April 18, 2013 Read time: 2 mins
Tesmec’s new ‘Trenchtronic’ technology reduces chance of errors due to operator inexperience
2342 Tesmec has developed new technology for its range of trenchers, which makes its machines ‘almost automatic’, according to business development director Paolo Celeri.

‘Trenchtronic’ allows the trenchers to self-adjust the engine load and travelling speed, depending on the soil type.

“There can be problems with these machines due to a lack of experience of the operators,” said Celeri. “We wanted to find a solution and came up with a system which reduces the influence of the operator.

“Our goal is to produce a drone machine, something we – and many other manufacturers – are working on.”  A fully-automated solution could be less than five years away, he added.

Celeri called on utility contractors to think more intelligently when selecting the right machine for the job. “One trencher can have the productivity of six to 10 excavators for a specific job, such as laying a pipeline or fibre optics,” he said. “And with an excavator, you typically over-excavate by 30 to 50%, which doesn’t happen with a trencher.

“It’s important that we make our engines less polluting, but we also need to change our approach to the way we do the work.”

To help customers further increase efficiencies, Tesmec has also introduced remote monitoring systems (Re.M). “We offer it as a service,” said Celeri. “We can see how a machine is working, what its engine load is, whether it is working or idle. And we can then transfer the data to the client to help them understand how they could improve performance.

www.tesmec.com

View more stories

For more information on companies in this article

Related Content

  • Tecnoidea’s high-beam design eases filter changes
    January 6, 2017
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant
  • Tecnoidea’s high-beam design eases filter changes
    April 17, 2013
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant
  • Custom solutions from GKN Land systems go on show at Conexpo 2014
    January 6, 2017
    GKN Land Systems has developed a high capacity hub and spindle solution for a pan scraper manufacturer looking to update its two-model range. “Our challenge was to go from a four-tyre to a two-tyre axle system, and give the OEM an option to provide different size wheel and tyre packages for its customers,” said Len Hensel, GKN Land systems’ chief engineer for wheels in the Americas. “The development of higher load capacity hub systems for this application led to the creation of a solution in just a few mo
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o