Skip to main content

Terex launches fully hydraulic self-erecting tower crane

Terex Cranes introduced the Eazy 90 fully-hydraulic self-erecting tower crane at INTERMAT. Equipped with a maximum 45m jib, the crane has a telescopic main tower with up to three additional mast sections. Erection can be carried out by two people in 2-4 hours depending on specification. The crane is equipped with safety lock-outs to ensure that each stage of erection has been completed before progressing to the next. A single operator is required to work the crane, with the Eazy 90 offering a maximum li
January 6, 2017 Read time: 1 min
Eazy 90 provides increased safety for fast tower erection
RSS2941 Terex Cranes introduced the Eazy 90 fully-hydraulic self-erecting tower crane at INTERMAT.

Equipped with a maximum 45m jib, the crane has a telescopic main tower with up to three additional mast sections. Erection can be carried out by two people in 2-4 hours depending on specification.

The crane is equipped with safety lock-outs to ensure that each stage of erection has been completed before progressing to the next. A single operator is required to work the crane, with the Eazy 90 offering a maximum lift capacity of 6 tonnes and a 1.4 tonne capacity at the boom tip.

www.terex.com

For more information on companies in this article

Related Content

  • Kuwait parking site job for Potain crane
    April 16, 2018
    NFT, one of the world's leading tower crane suppliers, continues to enjoy regional growth in the Middle East. The company has boosted its market presence in Kuwait with a number of deliveries to major projects in the country. One of the most significant has seen the first Potain self-erecting cranes enter the country. The customer, Nasser Al Hajri & Partners Company, bought an Igo T 130 and an Igo 50. NFT also won its first ever contract with local construction giant Combined Group Contracting (CGC). The
  • Italian highway bridge and tunnel link
    June 20, 2022
    A project in Central Italy is seeing the construction of new tunnel stretches, a bridge and a viaduct. The work is being carried out on State Road 318 by BESIX in partnership with DONATI, close to Perugia in Umbria.
  • New small bridge inspection from Moog
    January 6, 2017
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.
  • New small bridge inspection from Moog
    April 17, 2013
    The new crawler version of Moog’s MBI 50 unit has been designed especially for operation on narrow pedestrian bridges. With the load distribution on two crawlers it is possible to stick to a minimum area load even though the overall width is 1.6m and the weight 3,000kg. This makes it possible to work on bridges that are rated low-weight only.