Skip to main content

Terex Finlay puts new I-100RS mobile impact crusher on bauma stage

The new Terex Finlay I-100RS mobile impact crusher and the Terex Finlay J-1170 jaw crusher will be showcased at bauma as part of the Terex Materials Processing exhibit. Claimed by Terex Finlay to be a compact and aggressive tracked primary jaw crusher, the J-1170 is said to have a robust hydrostatically driven Terex jaw chamber which provides high capacity with large reduction ratios. The jaw chamber configuration can be set up specifically for either processing construction demolition debris or quarrying a
January 6, 2017 Read time: 1 min
Terex Finlay’s J-1170 jaw crusher is part of the Terex Materials Processing exhibit at bauma
The new 3501 Terex Finlay I-100RS mobile impact crusher and the Terex Finlay J-1170 jaw crusher will be showcased at bauma as part of the Terex Materials Processing exhibit.

Claimed by Terex Finlay to be a compact and aggressive tracked primary jaw crusher, the J-1170 is said to have a robust hydrostatically driven Terex jaw chamber which provides high capacity with large reduction ratios. The jaw chamber configuration can be set up specifically for either processing construction demolition debris or quarrying applications.

Two other model features - a heavy duty variable speed VGF and integrated prescreen – are said to give excellent production throughput in quarrying, mining, demolition and recycling applications. Notable options include a variable speed pan feeder along with an independent prescreen system.

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 43934 0 oLinkExternal www.terex.com www.terex.com false /EasySiteWeb/GatewayLink.aspx?alId=43934 false false%>

For more information on companies in this article

Related Content

  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    January 6, 2017
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    April 9, 2013
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a
  • Marini’s asphalt plants’ debut
    January 6, 2017
    Fayat’s Marini operation has been highly successful in China and the company intends to capitalise with the launch of new products for this market. Marini’s MAC 320 plant has sold in large numbers to China and the firm plans to further increase sales with its new series of asphalt batching plants. These are being introduced at the bauma China exhibition and the complete MAC range will feature six basic models, each of which is available in two configurations with a hot mix asphalt silo under the mixer or
  • Marini’s asphalt plants’ debut
    November 20, 2012
    Fayat’s Marini operation has been highly successful in China and the company intends to capitalise with the launch of new products for this market. Marini’s MAC 320 plant has sold in large numbers to China and the firm plans to further increase sales with its new series of asphalt batching plants. These are being introduced at the bauma China exhibition and the complete MAC range will feature six basic models, each of which is available in two configurations with a hot mix asphalt silo under the mixer or