Skip to main content

Tender cancelled for fifth section of Moscow’s central ring road

Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
December 15, 2014 Read time: 2 mins
Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow.

The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies.

The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluated objectively.

Russia’s Interfax news agency reported the win by Koltsevaya Magistral, trading as LLC Ring Road, in November.

Stroygazconsulting was in second place, 6119 Avtoban in third and 2450 Mostotrest in fourth.

The cancellation comes amid questions over the sale of a controlling stake in Stroygazconsulting to Ruslan Baysarov. In early June 2014, it was reported that Baysarov planned to increase his stake in the company from 30% to 74.1% by acquiring shares from founder and majority shareholder Ziyad Manasir.

However, the FAS reported it has not received an application for the purchase of the shares by Baysarov, a controversial figure who was born in Chechenya. His critics claim Baysarov, 46, is part of organised crime.

Representatives of the Stroygazconsulting have not commented on the lack of an application. According to market players, the company may be put up for sale, with 3014 Gazprombank said to be interested in the business.

Meanwhile, two other ring road tenders, this time in Omsk, Siberia, are nearing completion. The tenders are for construction of a single ring road section.

The first tender is for construction of a 17.2km road, an overpass across a railway and construction of a bridge. The second lot includes construction of a road junction and a 1.4km overpass.

Bids were submitted by DRSU #6, from the Omsk region and amounted to US$17.72 million. MSK Sibagro based in the city of Tyumen, bid $16.7 million, while Lenpromstroy, in St. Petersburg, bid nearly $16 million.

For more information on companies in this article

Related Content

  • Russia new programme for developing high-speed roads
    January 14, 2019
    Russia has approved a new state programme for the development of its high-speed road network – Eugene Gerden reports The Russian government has officially approved a new state programme, which is aimed at developing the federal high-speed road network in the country. This programme will run until 2030, according to recent statements by the official state press-service. According to some leading Russian experts in the roadbuilding sector, the need to implement these plans is acute. At present the tota
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Terex merger partner Konecranes plans efficiency savings
    February 10, 2016
    Finnish port crane manufacturer Konecranes, which plans to merge with Terex Corporation, said it will make annual cost savings of €25 million by the end of 2017. The company said that while merger talks with US manufacturer Terex continue, it needs to make efficiency savings. Around half of the savings will happen before the end of this year, according to a written statement. Plant down-sizing and closures are a possibility, as well as some streamlining of its product portfolio and its supply chain.
  • Construction to start on Hungary’s revamped M4 project in 2016
    July 7, 2015
    The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem