Skip to main content

Tender cancelled for fifth section of Moscow’s central ring road

Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
December 15, 2014 Read time: 2 mins
Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow.

The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies.

The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluated objectively.

Russia’s Interfax news agency reported the win by Koltsevaya Magistral, trading as LLC Ring Road, in November.

Stroygazconsulting was in second place, 6119 Avtoban in third and 2450 Mostotrest in fourth.

The cancellation comes amid questions over the sale of a controlling stake in Stroygazconsulting to Ruslan Baysarov. In early June 2014, it was reported that Baysarov planned to increase his stake in the company from 30% to 74.1% by acquiring shares from founder and majority shareholder Ziyad Manasir.

However, the FAS reported it has not received an application for the purchase of the shares by Baysarov, a controversial figure who was born in Chechenya. His critics claim Baysarov, 46, is part of organised crime.

Representatives of the Stroygazconsulting have not commented on the lack of an application. According to market players, the company may be put up for sale, with 3014 Gazprombank said to be interested in the business.

Meanwhile, two other ring road tenders, this time in Omsk, Siberia, are nearing completion. The tenders are for construction of a single ring road section.

The first tender is for construction of a 17.2km road, an overpass across a railway and construction of a bridge. The second lot includes construction of a road junction and a 1.4km overpass.

Bids were submitted by DRSU #6, from the Omsk region and amounted to US$17.72 million. MSK Sibagro based in the city of Tyumen, bid $16.7 million, while Lenpromstroy, in St. Petersburg, bid nearly $16 million.

For more information on companies in this article

Related Content

  • Moscow city government to build relief roads and highways
    June 6, 2016
    Moscow’s congestion problems need addressing but there are different solutions that could provide the answer – Eugene Gerden writes Moscow’s city government is considering building relief roads to ease congestion on the city’s key roads and highways. This plan has been revealed by recent statements from Marat Khusnullin, deputy mayor for urban policy and construction of the Moscow city government.
  • Mostostal Warszawa makes lowest bids in Poland’s S9 tenders
    November 24, 2017
    A Mostostal Warszawa consortium has reportedly made the lowest bids to build three sections of the S19 from Nisko to Sokolow Malopolski in south-eastern Poland. The consortium’s bid was just over €187 million in total. Other bids which were received from a Strabag consortium and a Budimex consortium.
  • Bids in for Bucharest Ring Motorway segment
    April 3, 2024
    The 101km-long motorway - also called the Bucharest Belt Motorway and the A0 Motorway -will be an outer ring highway to the existing inner Bucharest Ring Road around the Romanian capital city.
  • Morocco tender
    April 24, 2012
    The authorities in Morocco are now assessing 13 bids submitted in the tender for a new highway between El Jadida and Safi. The 141km road will cost some US$640 million to build. The project will be divided into four sections, the 20.6km El Jadida-Jorf Lasfar stretch, the 39.2km Jorf Lasfar-Sidi Smail stretch, the 38.85km Sidi Smail-Oualidia stretch and the 43.5km Oualidia-Safi stretch. The road will include six junctions and a toll barrier. The contract will be divided between the winning operators selected