Skip to main content

Tender cancelled for fifth section of Moscow’s central ring road

Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
December 15, 2014 Read time: 2 mins
Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow.

The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies.

The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluated objectively.

Russia’s Interfax news agency reported the win by Koltsevaya Magistral, trading as LLC Ring Road, in November.

Stroygazconsulting was in second place, 6119 Avtoban in third and 2450 Mostotrest in fourth.

The cancellation comes amid questions over the sale of a controlling stake in Stroygazconsulting to Ruslan Baysarov. In early June 2014, it was reported that Baysarov planned to increase his stake in the company from 30% to 74.1% by acquiring shares from founder and majority shareholder Ziyad Manasir.

However, the FAS reported it has not received an application for the purchase of the shares by Baysarov, a controversial figure who was born in Chechenya. His critics claim Baysarov, 46, is part of organised crime.

Representatives of the Stroygazconsulting have not commented on the lack of an application. According to market players, the company may be put up for sale, with 3014 Gazprombank said to be interested in the business.

Meanwhile, two other ring road tenders, this time in Omsk, Siberia, are nearing completion. The tenders are for construction of a single ring road section.

The first tender is for construction of a 17.2km road, an overpass across a railway and construction of a bridge. The second lot includes construction of a road junction and a 1.4km overpass.

Bids were submitted by DRSU #6, from the Omsk region and amounted to US$17.72 million. MSK Sibagro based in the city of Tyumen, bid $16.7 million, while Lenpromstroy, in St. Petersburg, bid nearly $16 million.

For more information on companies in this article

Related Content

  • A series of upgrades will improve Moscow’s road network
    October 26, 2012
    A series of major road projects will help improve Moscow’s connectivity. Russian contractor Mostotrest is to rebuild a series of road connections in Moscow, following the agreement of a deal with the Moscow Construction Department. The road building work will be on the southern section of the North-West Chord, a junction with the Skolkovo Highways and the Moscow Ring Road. Mostotrest will also construct new infrastructure and the whole package of works is worth some US$1.13 billion. The work will be carried
  • Central Ring Road to become one of most important projects in modern history of road-building in Russia
    December 16, 2014
    Moscow’s new ring road will provide a major economic boost and tackle congestion - Eugene Gerdner writes The Russian Government has officially started building of the Central Ring Road (CRR), one of the largest infrastructural projects in the modern history of the country. Total volume of investments in the project is estimated at more than US$7.2 billion (300 billion RUB). Building of the road should be completed by the World Cup 2018 and will be carried out as part of the existing state program ‘The de
  • Tender for section of Moscow-St Petersburg highway
    October 17, 2012
    The Moscow authorities are holding a tender for building a section of Moscow - St.Petersburg highway. The project includes construction of a North Literal Highway section with 15 viaducts. The maximum contract price has been set at US $ 953.12 million (RUB 29.70bn). The tender results will be announced on 30 October 2012. The works must be implemented within 24 months. Mostotrest and Transstroy can take part in the tender. Engeocom is not going to participate.
  • RDIF chief Dimitriev considers Arab partners for Moscow ring road
    October 16, 2014
    Arab partners have been secured as co-investors for construction of the third and fourth phase of Moscow’s Central Ring Road, Russia’s Interfax news agency reported. Kirill Dmitriev, head of the Russian Direct Investment Fund (RDIF), made the announcement earlier this month during a meeting of the State Council's presidium in Novosibirsk, chaired by president Vladimir Putin. Dmitriev did not name the Arab partners but said they “have confirmed their desire” to invest in the third and fourth phases.