Skip to main content

Tender cancelled for fifth section of Moscow’s central ring road

Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
December 15, 2014 Read time: 2 mins
Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow.

The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies.

The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluated objectively.

Russia’s Interfax news agency reported the win by Koltsevaya Magistral, trading as LLC Ring Road, in November.

Stroygazconsulting was in second place, 6119 Avtoban in third and 2450 Mostotrest in fourth.

The cancellation comes amid questions over the sale of a controlling stake in Stroygazconsulting to Ruslan Baysarov. In early June 2014, it was reported that Baysarov planned to increase his stake in the company from 30% to 74.1% by acquiring shares from founder and majority shareholder Ziyad Manasir.

However, the FAS reported it has not received an application for the purchase of the shares by Baysarov, a controversial figure who was born in Chechenya. His critics claim Baysarov, 46, is part of organised crime.

Representatives of the Stroygazconsulting have not commented on the lack of an application. According to market players, the company may be put up for sale, with 3014 Gazprombank said to be interested in the business.

Meanwhile, two other ring road tenders, this time in Omsk, Siberia, are nearing completion. The tenders are for construction of a single ring road section.

The first tender is for construction of a 17.2km road, an overpass across a railway and construction of a bridge. The second lot includes construction of a road junction and a 1.4km overpass.

Bids were submitted by DRSU #6, from the Omsk region and amounted to US$17.72 million. MSK Sibagro based in the city of Tyumen, bid $16.7 million, while Lenpromstroy, in St. Petersburg, bid nearly $16 million.

For more information on companies in this article

Related Content

  • Reconstruction of St Petersburg Ring Road section suspended
    August 3, 2015
    According to the Rosavtodor Federal Road Agency, a decision on a contractor for reconstruction of the northern section of the St Petersburg Ring Road, worth nearly US$96 million, has been suspended. The federal public institution St. Petersburg's Transport Bypass Construction Directorate, which manages the road, could not give any details regarding the suspension. The tender was announced in the end of 2014 and a decision on a contractor had already been postponed from June 30 to August 25.
  • Poland: tendering for Lodz's Western Ring-Road attracts 17 offers
    February 10, 2017
    The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
  • New Izhevsk Bridge project in Russia
    September 25, 2013
    A new bridge project is planned for Izhevsk in Russia. The bridge will span the Kama River and is expected to cost US$438 million to construct. The contractor VTB is one of the firms that will be involved in the construction of the crossing. In addition VTB is also looking to build a bridge spanning the Lena River as well as a section of the high speed highway that will link Russia’s major conurbations of Moscow and St Petersburg. This last contract looks likely to be awarded in the second quarter of 2014.
  • SDLG wheeled loaders for Moscow’s new roads and buildings
    March 28, 2014
    Two factories in Russia’s greater Moscow region are using SDLG wheeled loaders to help distribute sand and gravel for use in new roads being built across the region With Russia one of the world’s fastest growing market economies, its need for infrastructure expansion has meant more roads and, as a result, a massive increased need for sand and gravel production. Two sand and gravel factories near Moscow are said to be helping produce the new roads, sidewalks, and also, buildings.