Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Chilean highway tender process opening
    March 5, 2012
    Chile will see the tendering process for four major highway projects open during 2011. These will feature a total value of US$1.85 billion. The project data will be released by the Chilean Ministry for Public Works (MOP). The projects themselves include the $1.17 billion Americo Vespucio Oriente highway concession. The tender for this highway project will be launched during the second half of 2011, with the work itself scheduled for completion in 2016. Other projects include the Rutas del Loa (II Region) fo
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Two consortia bid for US$924.84mn Colombia highway concession
    April 17, 2014
    Two consortia have bid for Colombia's US$924.84 million (COP 1.79 trillion) Conexión Pacífico 1 highway concession, the first project under the Autopistas para la Prosperidad program and part of the country's fourth generation (4G) of concessions. There were 10 prequalified consortia and the two to submit bids were Autopista Conexión Pacífico I, comprised of local firm Estudios y Proyectos del Sol (Episol) and Spain's Iridium, and Infraestructura Vial de Colombia, comprised of Colombian firms Carlos Albe
  • Chile’s growing traffic volumes are a growing problem
    May 9, 2016
    Chile’s growing traffic volumes are creating a growing problem for traffic management. In many urban areas in Chile congestion is increasing at a rapid rate. Capital Santiago is afflicted particularly badly in this respect. Traffic jams are now frequent on the main interurban routes in Chile, especially on toll roads, and the number of vehicles travelling on these roads continues to rise month after month, leading to major concern.