Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Brazil: Rate of return for upcoming road tenders set at 9.2%
    July 16, 2015
    Brazil's Treasury Ministry has confirmed that the rate of return for the upcoming highway concession auctions is to be set at 9.2%, up from the 7.2% used in the previous round of tenders in 2013. The lower return is to ensure that the road tolls are lower. However, critics said the measure is not high enough and many contractors are looking for a rate of return of at least two digits, Brazil media reported. Even the increased rate as it stands will not lead to a greater number of contractors tendering fo
  • Windsor & Maidenhead starts £114.8 million highways competition
    May 5, 2025
    The seven-year maintenance contract covers 632km of roads as well as footways and bridges throughout the English borough just west of London.
  • Chile to tender for new road in Antofagasta
    April 18, 2017
    Chile’s Ministry of Public Works has launched the bidding process for construction of a 150km dual-carriageway in the region of Antofagasta. The new road will take in the communities of Calama and Sierra Gorda and include five flyovers and three rail overpasses, in addition to improvement works on the roundabout to access Calama. Technical offers are expected by July followed by financial analysis reports by August, according to the ministry. The estimated cost is around US$290 million. Meanwhile,