Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Mexico: OHL to bid for La Raza-Indios Verdes-Santa Clara contract
    June 22, 2015
    OHL Mexico, a subsidiary of Spanish construction firm OHL, has confirmed it will bid for the construction and operation contract for Mexico’s La Raza-Indios Verdes-Santa Clara motorway. The 9.5km road worth around US$364 million will be let as a public-private partnership under the federal government’s National Infrastructure Programme, Mexico’s El Economista newspaper reported. A total of 14 companies are interested in the project, including Pinfra, Ideal, Prodemex, China Harbour Engineering Mexico
  • Strong interest for major highway concessions in Colombia
    June 6, 2013
    Interest is said to be strong for the Pacífico 1, Pacífico 2 and Pacífico 3 highway concession projects in Colombia. At present the country’s national infrastructure agency, ANI, has 56 expressions of interest for the three highway concessions in Antioquia Department. The projects feature a total estimated investment of US$2.16 billion.
  • Thailand expressway tender underway
    January 5, 2023
    The tender process is underway for a Thailand expressway.