Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Elevated highway proposal for Philippines capital Manila
    April 5, 2017
    An 8.6km elevated highway project has been proposed for Manila, the capital of the Philippines. SM Investments and Ayala jointly submitted a proposal to build the Circumferential Road 3 (C3) Expressway to the Department of Public Works and Highways. The elevated highway being proposed would have four-lanes and measure 8.6km –long. The planned route would link Sta Mesa in Manila with the SM Mall of Asia complex in Pasay City. It would also pass through the Makati central business district and feature five in
  • India’s new highway project
    March 24, 2017
    India’s Eastern Peripheral Expressway project is now moving forward - Partha Pratim Basistha reports. Work on the 12- year pending, National, Eastern Peripheral Expressway-2, surrounding India’s National Capital, Delhi and its National Capital Region (NCR) has finally commenced. The project involves the North Indian states of Haryana and Uttar Pradesh and this development follows the approval of India’s Supreme Court. The project was held up due to land acquisition issues. Contractors are now in the process
  • Tunisia highway tender opening
    May 3, 2021
    A Tunisian highway tender is now opening for bid.
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.