Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Chile’s crowded roads face further congestion
    June 21, 2017
    Road congestion is a growing problem in Chile as the country’s vehicle fleet is fast outstripping road capacity. In 15 of the county’s major urban areas, the vehicle fleet is growing 10 times quicker than the rate of road construction.
  • Sydney, Australia, new highway extension
    June 14, 2018
    Plans have been unveiled for a new tunnel stretch in Sydney, Australia. The project is likely to cost US$1.98 billion (A$2.6 billion). This will involve building an underground extension to the F6 route in Sydney, providing a connection between the M5 and President Avenue. The new tolled link will be 4km long and is intended to reduce journey times for drivers, who will no longer have to pass through 23 sets of traffic lights. The project is also expected to reduce traffic volumes on General Holmes Drive.
  • Mexico’s Siglo XXI highway concession award triggers US$211mn investment
    December 2, 2013
    A Mexican consortium comprised of Pinfra, Grupo Bursátil Mexicano and Aldesa Mexico has secured a concession to build, operate and maintain the Siglo XXI highway concession in Morelos state, according to the transport and communications ministry, SCT. Around US$211 million (2.76 billion pesos) will be invested in the 62km highway over the next two years. Five companies, including OHL Mexico, are reported to have bid for the concession, with the Pinfra consortium presenting one of the lowest bids. This is
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario