Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Official sale of M6 Toll to be launched in September
    August 23, 2016
    An information memorandum that will officially launch the sale of M6 Toll, the UK’s only toll road, will be sent out to interested buyers in September. No date is set for sending out the IM, according to sources, but the 43km six-lane asset around the English city of Birmingham could be going for slightly less after the UK’s European Union referendum vote in June. The result of the so-called Brexit – ‘British exit’ of the EU – referendum was won by the no-to-Europe side and the UK is now setting up t
  • Major bridge project planned for Chile
    September 14, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million.
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Vietnam’s US$1.4 billion expressways for Cao Bang to Lang Son and Hoa Binh
    January 23, 2024
    Vietnam’s US$1.4 billion expressways to connect Cao Bang to Lang Son and transforming Hoa Binh.