Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Chile rules out proposal for a Santiago-Valparaiso route through La Dormida
    October 26, 2015
    Chile has shelved a proposal for a new road route between the inland capital of Santiago and the Pacific Ocean port of Valparaiso through the mountain called La Dormida. The new route, proposed by Grupo Costanera, would have needed a 68km tunnel through La Dormida. Chile’s Ministry of public works was considering a single investor for a package that would have included upgrades to the existing Route 68 between the two cities and also a new route. However, these two projects will remain separate and be
  • Plans for Chile-Argentina tunnel progressing
    August 14, 2014
    Successful talks have been held between Chile and Argentina regarding the planned Agua Negra road tunnel that will link the two countries. Further talks will be carried out with regard to financing the project but these look set to be completed towards the end of August 2014, according to a report from Business News Americas. One option is for Argentina’s Government to pay for the construction with the costs being recovered through tolling but other financing solutions have also been discussed. The Agua Neg
  • Chilean bridge repairs planned
    September 13, 2021
    Repair work is planned for a high profile Chilean bridge.
  • Chile’s US$1 billion Chiloe Island bridge behind schedule
    February 22, 2024
    Chile’s US$1 billion bridge to link Chiloe Island with the mainland is behind schedule.