Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Pavers produce on Chinese road building project
    May 19, 2015
    Volvo tracked pavers are helping China meet its ambitious programme of building 10,000km of roads annually. China’s ambitious road building programme is seeing over 10,000km of new highway being completed every year. Productivity, reliability and good uptime of equipment are key to this programme being achieved. And to the north of Xi’an, four Volvo Construction Equipment (Volvo CE) ABG8820 tracked pavers recently worked 14 hours/day paving the final layer of asphalt on a new highway. This 96km route opened
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Paraguay road tenders being planned
    March 3, 2016
    A series of tenders for major road projects is planned in Paraguay during 2016. The country's Ministry of Public Works and Communications (MOPC) will launch tenders with a total value of US$2.27 billion. The Ministry of Public Works and Communications will prioritise works including construction of the first stretch of the Bioceanic corridor, La Costanera Sur road and the 147km-long export corridor. The plans call for projects worth some $1.8 billion to go to tender in the first half of 2016. These projects
  • US$1.2 billion Brazil tolled highway auction opening
    November 13, 2024
    A US$1.2 billion Brazil tolled highway auction is opening for bids.