Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Chile’s road development work continues
    February 6, 2018
    Chile’s ambitious road development programme is continuing. Work is starting on the Americo Vespucio Oriente (AVO 1) highway project. This is expected to cost US$926 million and will provide an improved connection from the El Salto area to Principe de Gales. The work should be completed in the second half of 2021. However a number of complaints have been made with regard to the project, which could delay the timeframe once more. The project was originally due to open for traffic in 2020. Meanwhile Chile’s
  • Chilean highway project faces questions
    February 14, 2012
    The plans for Chile's new Vespucio Oriente highway are under a question mark at present. The Chilean Construction Chamber (CChC) and the association of concession-holders (COPSA) have raised concerns over the plans by the country's government to press ahead with the construction of the 13km Vespucio Oriente highway in capital Santiago.
  • Chilean highway; design unveiled
    May 17, 2019
    The design of a stretch of Chile’s Americo Vespucio Oriente (AVO) highway has been revealed.
  • Chile highway construction works planned
    May 12, 2017
    The Chilean Government is planning a series of major highway projects with the Ministry of Public Works (MOP) managing the works. The plans call for 14 concessions worth a total of US$3.74 billion to be awarded by January 2018. The second stage of Americo Vespucio Oriente highway (AVO 2) is costing $800 million and is a priority project. This has been delayed already and opening of the route is now expected for 2022. Five regional highways are also opening for tender, including the Ruta G-21 road link, whic