Skip to main content

TEM Italy building sites to start work on 11 June 2012

Italian motorway construction and management firm Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012. The total cost of the project is expected to reach US$ 2.51bn (€2bn).
June 1, 2012 Read time: 1 min
Italian motorway construction and management firm 5841 Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012.

The total cost of the project is expected to reach US$ 2.51bn (€2bn).

For more information on companies in this article

Related Content

  • Sarajevo Ring Road works set to finish in October 2012
    July 27, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag AG. The completed Ring Road will be part of the future Corridor Vc motorway.
  • Turkish firms bidding for Bosnian project
    April 19, 2012
    Bosnian Minister of Transport and Telecoms, Damir Hadzic, who is currently visiting Turkey has reported that there is a possibility that Turkey could be awarded a concession for construction of the southern part of the Corridor Vc motorway through Bosnia. He made his announcement for the Andoli agency. He said that he already held several talks with Turkish companies for construction of the motorway. The project value is expected to reach approximately EUR 2bn (USD 2.63bn). Mr Hadzic said that Bosnia could
  • US$2.66 billion tender for Poland’s A1 motorway will be called in mid-2013
    January 25, 2013
    Poland's General Directorate for National Roads and Motorways (GDDKiA) is to announce a US$2.66 billion [€2bn] tender in mid-2013 for the construction of the A1 motorway between Pyrzowice near Katowice and Tuszyn near Lodz. According to the head of GDDKiA, the tender for the 140km-long road will be divided into sections of around 20km. The Polish government has given up on its original idea of constructing the road on a PPP model, since Eurostat insisted that the cost of the project should be added to Polan
  • Romania: Fagaras-Brasov work to start soon
    January 24, 2022
    A design contract for the 43km Fagaras-Brasov section of the 130km-long Brasov-Sibiu motorway was signed last summer.