Skip to main content

TEM Italy building sites to start work on 11 June 2012

Italian motorway construction and management firm Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012. The total cost of the project is expected to reach US$ 2.51bn (€2bn).
June 1, 2012 Read time: 1 min
Italian motorway construction and management firm 5841 Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012.

The total cost of the project is expected to reach US$ 2.51bn (€2bn).

For more information on companies in this article

Related Content

  • Gabon highway work starting
    July 27, 2020
    Work is starting on a new highway route for Gabon.
  • Plans for Italy's key highway unveiled
    May 15, 2012
    plan for Italy’s key Orte-Mestre highway has been unveiled with the project expected to cost over €11 billion. Of this, some €1.43 billion is expected to be funded by the Italian Government, while €9.5 billion is expected to be provided by private sources. The work is expected to take several years to complete. The project will link the Adriatic Centre-South with the North-East, and connect with Europe’s with the corridor 5, running from Lisbon-Kiev.
  • Italian highway bridge and tunnel link
    June 20, 2022
    A project in Central Italy is seeing the construction of new tunnel stretches, a bridge and a viaduct. The work is being carried out on State Road 318 by BESIX in partnership with DONATI, close to Perugia in Umbria.
  • Serbia Corridor 11 motorway works due to begin in March 2013
    January 23, 2013
    Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc