Skip to main content

TEM Italy building sites to start work on 11 June 2012

Italian motorway construction and management firm Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012. The total cost of the project is expected to reach US$ 2.51bn (€2bn).
June 1, 2012 Read time: 1 min
Italian motorway construction and management firm 5841 Tangenziali Esterne Milano (TEM) has revealed that work at the building sites for the Rivoltana-Truccazzano stretch of the east Milan ring road will start on 11 June 2012.

The total cost of the project is expected to reach US$ 2.51bn (€2bn).

For more information on companies in this article

Related Content

  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.
  • Smart motorway project for UK’s M3
    July 23, 2014
    Balfour Beatty is to work on a €163.5 million (£129 million) upgrade project for a 21.4km stretch of the M3 motorway in the UK. The work involves upgrading the route to smart motorway status and is being carried out for the UK Government’s Highways Agency. This project will increase capacity, reduce congestion and shorten journey times for the 120,000 motorists/day using the route. This section of the motorway runs through the counties of Hampshire and Surrey, between Junction 2 which is interchange with th
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • A slow start for Mexico’s Atizapan-Atlacomulco highway
    June 9, 2015
    Almost one year after work started on Mexico’s Atizapan-Atlacomulco highway, little progress appears to have been made. OHL Mexico, a subsidiary of the Spanish construction firm OHL group -- Obrascon Huarte Lain -- said that the apparent lack of progress is due to the government not having arranged access to the road. Sergio Hidalgo, director general for OHL Mexico, told investors that the land for the first of three stages of the project, covering 25km between Atlacomulco and Ixtlahuaca was released