Skip to main content

Tanzania road deal for Australian consultant

Australian engineering consultant SMEC is handling key construction supervision contracts in Tanzania. The firm will supervise upgrading work on the Nzega-Tabora road, which is being rebuilt with an asphalt surface.
February 9, 2012 Read time: 1 min
Australian engineering consultant 1326 SMEC is handling key construction supervision contracts in Tanzania. The firm will supervise upgrading work on the Nzega-Tabora road, which is being rebuilt with an asphalt surface. SMEC has two separate contracts for this link, for the 60km Lot 1 stretch from Nzega-Puge and the 56km Lot 2 section from Puge-Tabora. The two roads are located in the Tabora region and form part of the mid-west corridor that connects the 921km Tanzam Highway, which links the port of Dar es Salaam to Zambia and Malawi. The project is funded by the Tanzanian Government and forms part of a strategy to improve the road network across the country to help boost transport and economic development. SMEC's deal includes supervision of the works contract to ensure that the construction complies with the approved designs, drawings, specifications, conditions of contract and engineering practice. SMEC will also give its approval of contractor's working drawings; preparation of the final construction report and as-built drawings of all completed works; and supervision of maintenance activities during the defects liability period.

For more information on companies in this article

Related Content

  • Building a major Turkish highway project
    August 15, 2018
    The North Marmara Motorway Project in Turkey has been a major focus for project financing, as well as for novel technical solutions for its construction. This mega infrastructure project is intended to boost transport connectivity between the European and Asian sides of Turkey International law firm Winston & Strawn LLP has advised on major project financing for two sections of the highway. The structure for implementation of the Project is based on the build-operate-transfer (BOT) concession model. The
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).