Skip to main content

Taiwanese firm building Vietnam road

A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construct
June 17, 2013 Read time: 1 min
A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construction of eight bridges.

Related Content

  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Vietnam’s US$1.1 billion expressway stretch
    April 19, 2024
    New additions are planned for Vietnam’s US$1.1 billion expressway project.
  • New Vietnam bridge project to cut congestion
    October 24, 2016
    A new bridge project in Vietnam’s Ho Chi Minh City will help cut traffic congestion. The project is expected to cost in the region of US$157 million and four contractors will work on the construction of the 3.2km long Bình Tiên Bridge. The plans call for the bridge to carry four traffic lanes and be from 30-40m wide, although the design has yet to be finalised. The work will be carried out in two separate sections, while the client for the Bình Tiên Bridge and Road project is Ho Chi Minh’s Transport Departm
  • Vietnam highway building being speeded up
    August 22, 2017
    Vietnam’s Ministry of Transport is to prioritise construction of the new North-South Expressway. The project will provide a much improved connection between the country’s north and south, speeding transport and boosting safety. It will feature from four to six lanes and have speed limits ranging between 80km/h and 120km/h. The cost of the project is expected to be US$13.75 billion, with 17 of the 20 work packages being carried out under the build-operate-transfer model.