Skip to main content

Taiwanese firm building Vietnam road

A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construct
June 17, 2013 Read time: 1 min
A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construction of eight bridges.

Related Content

  • Vietnam-Cambodia expressway link gets approval
    May 5, 2017
    Construction of a new expressway is intended to improve the connection between Cambodia’s capital Phnom Penh and Vietnam’s capital, Ho Chi Minh City. This is the product of discussions between the Vietnamese and Cambodian governments. The project is expected to cost US$650 million and the new link will feature three lanes in either direction and will run alongside the existing Highway 22 in Vietnam and Highway 1 in Cambodia. The new route will feature a maximum speed of 120km/h and will stretch for 65km in
  • US$1.1 billion PPP highway for Vietnam
    June 28, 2024
    A US$1.1 billion PPP highway is planned for Vietnam.
  • New road works for Ho Chi Minh City
    June 1, 2021
    New road works are planned for Vietnam’s Ho Chi Minh City.
  • Vietnam’s north-south highway being planned
    June 5, 2017
    Plans are being formalised for Vietnam’s massive North-South Expressway project. The tolled route will stretch 1,372km and the project will be split into 20 separate sections, with the work being carried out in two separate phases.