Skip to main content

Taiwanese firm building Vietnam road

A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construct
June 17, 2013 Read time: 1 min
A Taiwanese-owned construction company will build a new road in Vietnam’s Quang Hing Province. The new road will measure 20km long and will connect Ha Long City and Bach Dang Bridge. Costing close to US$276 million to construct, the road will connect with the existing Hanoi-Hai Phong Expressway. The work is being carried out under the build-transfer model and is due for completion by 2015. The new road will feature four lanes in all, with two lanes in either direction, and the project includes the construction of eight bridges.

Related Content

  • Vietnam highway project completed by OHL
    September 7, 2017
    Work is now complete on the US$76.3 million highway project providing a key link between the North and the South of Vietnam at Da Nang city. This 13km project was carried out by Spanish contractor OHL, having been awarded in 2014 by Vietnam Expressway Corporation. Financing for the work came from the Japan International Cooperation Agency (JICA). Meanwhile OHL is also building a 544m viaduct over the Lanch Tray River in Vietnam that will provide a new link to the coastal city of Hai Phong.
  • Northern Vietnam’s new coastal highway link
    April 4, 2017
    Work on a new 550km-long coastal highway is to commence in northern Vietnam. The highway will be built across five provinces and will connect with Haiphong City. The planned route will run through the provinces of Thanh Hoa, Ninh Binh, Nam Dinh, Thai Binh and Quang Ninh. The project should be complete by 2020 should all go to plan and is to be carried out under the PPP model. The cost of the entire highway has yet to be revealed. However the 61km stretch through Thahn Hao Province looks set to have a pricet
  • New bridge projects underway in Vietnam
    December 14, 2015
    Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.
  • Vietnam expressway opening
    May 3, 2022
    A new Vietnam expressway will be opening shortly.