Skip to main content

Strabag wins €34.6mn road modernisation contract

The Austrian group Strabag has been awarded a two-year contract worth €34.6mn for the modernisation of a 48km stretch of the national road M2 in the Republic of Moldova. The upgrade route runs between Ghindesti and Drochia.
July 20, 2012 Read time: 1 min
The Austrian group 945 Strabag has been awarded a two-year contract worth €34.6mn for the modernisation of a 48km stretch of the national road M2 in the Republic of Moldova. The upgrade route runs between Ghindesti and Drochia.

For more information on companies in this article

Related Content

  • Mexican firm wins major Mexican highway contract
    May 9, 2016
    A Mexican firm has been awarded a major highway concession package in the country. Promotora y Operadora de Infraestructura (Pinfra) will build, operate and maintain La Raza-Indios Verdes-Santa Clara motorway for a 30-year concession. The package of works was awarded by the Mexican Secretariat of Communications and Transport (SCT). Pinfra’s offer was for a US$376.12 million deal for the implementation of the 10km route. This stretch of highway is expected to carry 50,000 vehicles/day. However, the offer
  • Nairobi road to nowhere?
    January 3, 2013
    International environmental pressure groups claim a vital road in Kenya goes through parkland as Shem Oirere reports. Kenya’s Nairobi Southern Bypass, a 28.6km stretch has become the second road project in East Africa to run into problems. Designed to the Class A International Trunk Road Standard, the route has been targeted by international environmental pressure groups following Tanzania’s Serengeti Highway, which was derailed last year. The US$208 million bypass will link Mombasa Road, near Ole Sereni Ho
  • Strabag bosses admit defeat over €300 million 2012 EBIT target
    July 25, 2012
    Austrian construction company Strabag’s “more than ambitious” €300million earnings before interest and taxes (EBIT) target cannot be achieved, according to the firm’s management board. The board say the projected EBIT can now only be reached by “about two thirds”. This is said to be partly due to the delays of public authorities in Central and Eastern Europe in dealing with claims, especially in Poland; the cautious valuation of some construction projects; and the “ruinous price war” in the raw materials b
  • Targeted road loan for Uzbekistan
    July 8, 2020
    A targeted road loan will pay for a route upgrade in Uzbekistan.