Skip to main content

STRABAG will lead A4 highway deal in Poland

Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
May 9, 2013 Read time: 2 mins
Austrian contractor 945 Strabag is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the construction of two interchanges and access roads as well as the rehabilitation of local roads. Additional works involve the construction of 13 road overpasses, nine motorway overpasses and five bridges as well as the rehabilitation of the water, gas and electricity lines. The construction of the section between Krzyż and Dębica is the second section of the A4 being built by a Heilit+Woerner-led consortium. The company previously worked on the 21km section between Brzesko and Wierzchosławice, which was opened to traffic in November 2012.

For more information on companies in this article

Related Content

  • Czech Republic highway deal for consortium
    October 8, 2020
    A highway deal in the Czech Republic will be handled by a consortium.
  • Strabag picks up Czech D1 motorway deal
    December 21, 2018
    Strabag is to modernise nearly 15km of the D1 motorway in the Czech Republic under a contract worth nearly €73 million. Work includes complete renewal of the cement concrete surface between Velký Beranov and Měřín to be done within three years. Working on the project are the consortium leader Strabagm based in Austria, and its two partner companies Metrostav and EUROVIA’s Czech subsidiary. The project will begin with a temporary widening of the motorway in the direction of Prague to allow full reno
  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
  • STRABAG wins contract for Hamburg, Germany
    August 26, 2020
    STRABAG has won a major highway contract in Hamburg, Germany.