Skip to main content

STRABAG will lead A4 highway deal in Poland

Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
May 9, 2013 Read time: 2 mins
Austrian contractor 945 Strabag is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the construction of two interchanges and access roads as well as the rehabilitation of local roads. Additional works involve the construction of 13 road overpasses, nine motorway overpasses and five bridges as well as the rehabilitation of the water, gas and electricity lines. The construction of the section between Krzyż and Dębica is the second section of the A4 being built by a Heilit+Woerner-led consortium. The company previously worked on the 21km section between Brzesko and Wierzchosławice, which was opened to traffic in November 2012.

For more information on companies in this article

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Poland targets 300km or new roads for Western Pomerania by 2023
    August 1, 2017
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the National Roads Construction Programme. Among the project in the region that borders the country’s Baltic Sea coast is an S3 dual carriageway between the towns of Swinoujscie and Szczecin. Poland’s General Directorate for National Roads and Motorways (GDDKiA) plans to build around 300km of roads in Western Pomerania by 2023. The move is part of the
  • Key French highway upgrade deal for consortium
    March 5, 2012
    The French Government has agreed a highway contract with consortium Atlandes for a section of the A63 autoroute in southwest France.
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot