Skip to main content

STRABAG will lead A4 highway deal in Poland

Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
May 9, 2013 Read time: 2 mins
Austrian contractor 945 Strabag is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the construction of two interchanges and access roads as well as the rehabilitation of local roads. Additional works involve the construction of 13 road overpasses, nine motorway overpasses and five bridges as well as the rehabilitation of the water, gas and electricity lines. The construction of the section between Krzyż and Dębica is the second section of the A4 being built by a Heilit+Woerner-led consortium. The company previously worked on the 21km section between Brzesko and Wierzchosławice, which was opened to traffic in November 2012.

For more information on companies in this article

Related Content

  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • US$346 million Charlotte, NC highway works
    August 16, 2024
    The US$346 million I-485 highway project for Charlotte, NC is underway.
  • Vietnam’s North-South Expressway sections
    March 24, 2025
    Key sections of Vietnam’s North-South Expressway are nearly complete.