Skip to main content

Strabag bosses admit defeat over €300 million 2012 EBIT target

Austrian construction company Strabag’s “more than ambitious” €300million earnings before interest and taxes (EBIT) target cannot be achieved, according to the firm’s management board. The board say the projected EBIT can now only be reached by “about two thirds”. This is said to be partly due to the delays of public authorities in Central and Eastern Europe in dealing with claims, especially in Poland; the cautious valuation of some construction projects; and the “ruinous price war” in the raw materials b
July 25, 2012 Read time: 1 min
RSSAustrian construction company 945 Strabag’s “more than ambitious” €300million earnings before interest and taxes (EBIT) target cannot be achieved, according to the firm’s management board.
The board say the projected EBIT can now only be reached by “about two thirds”. This is said to be partly due to the delays of public authorities in Central and Eastern Europe in dealing with claims, especially in Poland; the cautious valuation of some construction projects; and the “ruinous price war” in the raw materials business.

For more information on companies in this article

Related Content

  • Optimising traffic control ensures efficient use of infrastructure
    April 10, 2013
    Central and local governments are facing many challenges, not least a shortage of funds due to budget restraints in the US and Europe in particular. In other markets, ensuring efficient traffic flow is the priority, with monitoring of network status being a key tool. New technology for traffic monitoring plays a crucial role and the sector is keen to introduce new and more efficient systems. The Transport Research laboratory (TRL) has long been a pioneer of traffic control technologies and its latest MAAPc
  • Debut for Godwin’s low-head Vac-Prime pump
    January 6, 2017
    Xylem company Godwin has launched the Vac-Prime low-head pump to complement its Dri-Prime medium- to high-head range. Xylem’s Godwin Vac-Prime has been specifically designed for lower-head dewatering applications. It can manage heads of 11m to 25m, flows of 100m3/hour to 374m3/hour and solids with sizes from 45mm to 75mm. The pump is available in 4” and 6” (101mm and 152mm) versions.
  • Debut for Godwin’s low-head Vac-Prime pump
    April 17, 2013
    Xylem company Godwin has launched the Vac-Prime low-head pump to complement its Dri-Prime medium- to high-head range. Xylem’s Godwin Vac-Prime has been specifically designed for lower-head dewatering applications. It can manage heads of 11m to 25m, flows of 100m3/hour to 374m3/hour and solids with sizes from 45mm to 75mm. The pump is available in 4” and 6” (101mm and 152mm) versions.
  • Regional seminar on performance based contract for road, Arusha, Tanzania July 2016
    May 19, 2016
    Without timely and proper maintenance, the condition and value of road networks, and the benefits from investing in these road networks, deteriorate, diminish, and become smaller. In much of Africa, the condition of the road networks leaves much to be desired. The IRF Geneva is coming together with the Tanzanian Ministry of Works, Transport and Communications, the Tanzania National Roads Agency (TANROADS), the Tanzanian Roads Fund Board, Tanzanian Road Association (TARA), the Tanzania Transportation Tec