Skip to main content

St Petersburg sets ring road strategy

Discussions are being held in St Petersburg over the route for the city's new second ring road project.
March 1, 2012 Read time: 1 min
Discussions are being held in St Petersburg over the route for the city's new second ring road project. A preliminary route should be ready by late May 2011. The Coordination Council for development of the transport system of St Petersburg and Leningrad region is oversee construction of the second ring road (KAD-2). The construction schedule has yet to be revealed however, although it is expected that the road will be ready to carry traffic by 2020. Financing for the project has yet to be revealed and the road may be tolled, although private funding sources may also be used.

Related Content

  • Bosnia-Serbia highway financing discussions
    October 13, 2017
    Discussions between Serbia and Bosnia regarding the planned highway linking the two countries have yet to be carried out. The highway will join the two capitals, Belgrade and Sarajevo. However Turkey has said it will not enter discussions regarding its providing financing for the project until Bosnia and Serbia have determined the route the new highway will take. Turkey says that it recognises the economic importance of this highway for the region as a whole, which is why it is willing to discuss financing.
  • Norway’s long tunnel looks set to beat records
    September 19, 2016
    Norway looks set to retain its position as a leader in tunnelling with the project moving forward to build a new link connecting the city of Stavanger with Bokn. This 27km road tunnel is being designed to carry four lanes of traffic, which would make it the world’s longest underwater road tunnel. It will also be the world’s longest four lane tunnel as well as the world’s deepest road tunnel, dropping around 385-390m below sea level. The Rogaland Fixed Link will form part of the E39 route, connecting Kristia
  • Roads to Recovery after the pandemic
    January 11, 2021
    IRF president Bill Halkias shares the Federation’s view on post-Covid
  • Key road projects underway in East Africa
    December 6, 2013
    A series of road improvements and investments will improve connections in Uganda, Tanzania and Ethiopia. The World Bank is offered the Ugandan Government a loan of US$400 million to rebuild roads in Kamdini and Tororo-Soroti-Lira. This funding will allow contractors to carry out road maintenance on the roads for 7-10 years, with work scheduled to start in 18 months. Meanwhile a deal worth $335.76 million has signed by the Tanzanian Government for the second phase of the Road Sector Support Project (RSSP-II