Skip to main content

St Petersburg city centre to get ‘highway frame’

Local government leaders in the Russian city of St Petersburg have announced plans for a ‘highway frame’ around the historic city centre. The highway with uninterrupted traffic flow will connect the Primorsky district to Obvodny Canal with an entrance to Western High-Speed Diameter. The project offers to resume bridge construction across the Malaya Neva from Petrogradskaya Storona to Vasilyevsky Island, to reconstruct Obvodny Canal embankments, and to build a highway with a bridge in range of Fayansovaya an
August 23, 2012 Read time: 1 min
Local government leaders in the Russian city of St Petersburg have announced plans for a ‘highway frame’ around the historic city centre.

The highway with uninterrupted traffic flow will connect the Primorsky district to Obvodny Canal with an entrance to Western High-Speed Diameter. The project offers to resume bridge construction across the Malaya Neva from Petrogradskaya Storona to Vasilyevsky Island, to reconstruct Obvodny Canal embankments, and to build a highway with a bridge in range of Fayansovaya and Zolnaya streets.

The project is expected to cost US $ 4.08- $4.71 billion (RUB 130-150bn), with around US $1.06 billion (RUB 34bn) coming from the Federal budget. The Federal funds are set to be transferred from Orlovsky tunnel project. Construction of highway 7 and the highway in range of Fayansovaya and Zolnaya streets are said to be implementable via concession agreements.

Related Content

  • AfPA alarmed over Australia’s new funding split
    November 17, 2023
    The Australian Flexible Pavement Association says the federal government’s plan for a 50:50 split with states and territories is highly “controversial” and comes amid major road and rail project cancellations.
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • New bridge link for St Petersburg Island
    February 23, 2018
    A new bridge is being built to connect Serny Island in St Petersburg. The bridge will feature three lanes of traffic in either direction, as well as pedestrian and cycling facilities. The bridge pylons have been constructed and the cable stays are being installed. The work is costing US$150.4 million.
  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc