Skip to main content

Sri Lanka's new highway - on track

Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
February 14, 2012 Read time: 3 mins
Sri Lanka's new Southern Expressway will reduce journey times and reduce accident numbers between capital Colombo and the southern city of Galle.
Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues. The new 126km highway starts at Kottawa and ends at Godagama in Matara and is expected to make a major reduction in journey times, in addition to reducing accident rates. At present, it takes around 4.5-5 hours to travel from capital Colombo to Matara using the coastal road, which carries just one traffic lane in either direction. However once the Southern Expressway is open to traffic the journey time is expected to drop to just 2 hours. The road will feature a design speed of 120km/h and will provide a key link between Colombo and the southern city of Galle, cutting journey times from the present 3.5-4 hours to less than 90 minutes. The project is being carried out in phases, with the Kottawa - Dodangoda section featuring two lanes in either direction, the Dodangoda - Godagama stretch having one lane in either direction, and the Kottawa - Matara stage having three lanes in either direction. The project also includes a 4.9km link from the main expressway to the city of Galle. The aim of the project is to improve transport facilities and help boost the development of Sri Lanka's Southern Region. The project will also help promote inter-regional transport facilities and forms a major component of Sri Lanka's proposed Expressway network. The Sri Lankan government has decided to install CCTV on the Southern Expressway in a bid to deter drivers from exceeding the 100km/h speed limit. The 2638 Road Development Authority of Sri Lanka (RDA) has said that the CCTV cameras will be installed first on the stretch from Colombo to Galle. The RDA has said that the Southern Expressway from Colombo to Galle is to be opened in August. Following several studies in late 1980, the Colombo-Matara Expressway concept was planned based on the thinking that development of southern corridor would help boost Sri Lanka's economy. In 1997, the Government of Sri Lanka obtained financial assistance from the 943 Asian Development Bank and carried out a feasibility study in 1998. The Funding Agencies, Asian Development Bank (ADB) and 2649 Japan Bank of International Cooperation (JBIC) agreed to provide the funding for the STDP. Section from Kottawa to Kurundugahahetekma (65km) was undertaken by JBIC and section from Kurundugahahetekma to Godagama (65km) was undertaken by ADB. However, in 2007, a restructuring of the contract was required due to the increased work scope and ADB's funding was limited to the section from Kurundugahahetekma to Galle (30km), including the Galle Port Access Road. Meanwhile, 2650 Sri Lanka Ministry of Economic Development has announced plans for a programme of provincial road development works. The plan involves a budget of $201 million and will target upgrades to over 3,740km of roads. The work will be carried out in districts all over the country and will include replacing culverts, installing better storm drainage, building bridges and improving pavement quality. Galle District's Provincial Road Development Project is also now underway, with upgrades being carried out to 310km of provincial roads in Galle District. Work has started on the Aluthwala Junction-Kirindela-Meetiyagoda-Galaboda Junction Road in Ambalangoda; the Unawatuna Eramudugaha Junction-Ginigala Road in Habaraduwa; and the Pinnaduwa-Pilana Road in Akmeemana.

Related Content

  • Vietnamese expressway works planned
    May 23, 2022
    New Vietnamese expressway works are being planned.
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Nicaragua road project funding deal
    February 1, 2018
    Nicaragua’s Ministry of Transport and Infrastructure (MTI) is setting out its road development programme for 2018. In all the plans call for the construction of 171km of roads. Work will be completed for the road from Mulukuku to Siuna, with the first 23km stretch due to open in September 2018 and the remaining 21.5km expected in December 2018. Meanwhile the road from Nueva Guinea to San Francisco should be complete by November 2018. Work started on these two routes in 2016. The project also calls for
  • India’s massive demand for bitumen
    March 9, 2016
    India to lead the pack in bitumen consumption - Partha Pratim Basistha reports from the Asian Bitumen Conference. In the emerging global bitumen market, demand is expected to reach 122 million tonnes by 2018. Increasing road construction activities in the fast growing markets of India and China will be the main growth drivers of the bitumen market in Asia. This was the message delivered at the 10th Asian Bitumen Conference held in New Delhi, India from 23rd-24th November 2015. The two-day event, organised b