Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • Colombia’s popular highway tenders
    April 7, 2014
    International interest is strong in tenders opening in Colombia for the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad, worth some US$4.75 billion in all. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.
  • Pakistan highway and flyovers project
    May 19, 2020
    A highway and flyover building work is being planned in Pakistan.
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of
  • US$625 million Rhode Island bridge repair plan
    August 20, 2024
    Rhode Island will benefit from a US$625 million bridge repair programme.