Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • A new tunnel project for Turkey is a significant move
    December 12, 2012
    The European Bank for Reconstruction and Development (EBRD) is supplying a finance package worth US$150 million for the new Bosphorus crossing project in Turkey. Running under the Bosphorus at Istanbul, the new tunnel will connect both European and Asian sides of the city. The EBRD’s $150 million loan completes $1.4 billion worth of financing required for the Eurasia Tunnel project, being built under the Bosphorus straits. Other components of the $1.4 billion financing package for this PPP project include a
  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an
  • Bolivia’s latest highway project is underway
    May 29, 2018
    Bolivia’s new highway project will improve connections with Brazil and Chile – Mauro Nogarin reports. Work is underway on Bolivia’s new Rurrenabaque – Riberalta highway project, which will boost connectivity for the country. The project is being coordinated by the Bolivian Highway Administration (ABC), with an Eximbank loan of US$579.4 million providing the financing for 85% of the work. The remaining 15% of the funding will come from the Beni Department’s budget, where the route is being built. Located in
  • Colombia highway plans announced
    June 4, 2020
    Key Colombian highway plans are being announced.