Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • Costa Rica bridge connection underway
    November 26, 2020
    Construction is underway for a key Costa Rica bridge connection.
  • Bolivian highway project underway
    February 28, 2012
    Work is now underway on a new highway in Bolivia connecting Villa Tunari and San Ignacio de Moxos.
  • New highway project in Mozambique connecting with neighbouring Malawi
    May 24, 2013
    The new Mozambique to Malawi highway connection will improve rtade and transport between the neighbouring nations. Phase II of the project for Integrated Development of the Milange – Mocuba Corridor is now commencing and plans are in hand for work to upgrade trunk road N 11. The link will feature an asphalt surface as part of the upgrade. The National Road Administration of Mozambique (ANE) has opened this road project for bidding. This 110km project will complete a transport corridor linking Malawi to Moza
  • Mexico’s new Jala-Puerto Vallarta Highway
    August 29, 2017
    Mexico’s highway infrastructure plays a key role in the country’s economy, carrying around 55% of its freight and 98% of its passenger traffic. To meet this demand, the network has 377,660km of roads in all. This is split between the 49,652km federal highway network, the 83,982km of state roads, 169.429km of rural roads and 74,596km of access roads. mHowever, although the federal road network manages to connect a large part of the country's strategic points, some stretches already present problems with satu