Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Cutting congestion in California with highway works
    December 15, 2023
    New California highway projects will help reduce congestion.
  • Romanian roads under construction
    May 9, 2012
    Funding worth some €177.5 million from the European Commission (EC) will pay for a highway construction project in Romania. This non-refundable financing will pay for the construction of a 27.4km stretch of the Lugoj-Dumbrava highway. This section forms part of Lugoj-Deva highway that is itself a part of the Pan-European Corridor IV.