Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • India rushing to improve its highway system
    February 9, 2012
    Despite the world economic slowdown, India still seems in a rush to improve its highway system as Patrick Smith reports. Later this year India will be seen by hundreds of millions worldwide when the country's capital New Delhi hosts its biggest event ever.
  • Spanish road improvements for Valencia Region
    March 25, 2015
    Spain's Ministry for Works, has announced plans for €670 million worth of road works to be carried out in the Valencia Region. Of this sum, over €265 million will be spent in Alicante Province. The programme of works will develop the road network in the region, strengthening its economic potential and improving the lives of its residents. The first stretch of the Ronda Sur road project has already been opened, which will improve connections between Alicante and the region of Murcia.
  • Vietnam’s North-South Expressway sections
    March 24, 2025
    Key sections of Vietnam’s North-South Expressway are nearly complete.
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.