Skip to main content

Spanish firms interested in US$740mn Chile bridge project

Spanish companies Sacyr, ACS and OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile. Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.
June 5, 2013 Read time: 1 min
Spanish companies 3959 Sacyr, 917 ACS and 980 OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile.

Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.

Sacyr has formed a consortium with Samsung C&T Corporation and 3220 Parsons Transportation; ACS through subsidiary 981 Hochtief, has joined forces with 5177 Vinci, Constructora VCGP Chile, and 1021 American Bridge Company; and OHL has formed a consortium with Engineering & Construction and 2579 Mott MacDonald. The five international consortium bidding for the project are led by 3149 Impregilo; 890 China Railway Group; 3366 China Road and Bridge Corporation; 1324 Astaldi; and 1511 OAS of Brazil.

For more information on companies in this article

Related Content

  • Colombia investing in new highways
    February 10, 2014
    Colombia's national infrastructure agency (ANI) has prequalified 10 companies for its US$770 million highway project Autopista al Mar 2. This new route will improve connections in western Antioquia department between Medellín and the Pacific coast, according to Business News Americas. The project is for the operation and maintenance of 176km of highways, as well as the construction of 41 bridges and 19 tunnels. Among the companies prequalified are Spain's Sacyr, Cintra, Acciona and OHL, France's Vinci, and
  • Chile’s major bridge construction project
    April 25, 2017
    Planning work for Chile’s Chacao Bridge project is underway at present. The new suspension bridge will provide a link to Chiloe Island and will be the longest structure of its type in Latin America when complete. Because of the risk of major earthquakes in the area, the bridge has to be constructed to cope with substantial shocks. The project is being handled by the Consorcio Puente Chacao consortium and has been in the design phase since February 2014. Chile’s Ministry for Public Works wants to ensure that
  • Republic of Ireland’s N25 New Ross Bypass achieves financial close
    March 3, 2016
    The €230 million N25 New Ross Bypass public-private partnership (PPP) project in County Wexford, Republic of Ireland has reached financial close. Mott MacDonald is technical advisor on the public-private partnership, awarded by the National Roads Authority, otherwise known as Transport Infrastructure Ireland. Work will be carried out by BAM Ireland and Dragados, a construction division of ACS Group, based in Spain. The scheme involves construction of 13.6km of dual carriageway and 1.2km of new or u
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con