Skip to main content

Spanish firms interested in US$740mn Chile bridge project

Spanish companies Sacyr, ACS and OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile. Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.
June 5, 2013 Read time: 1 min
Spanish companies 3959 Sacyr, 917 ACS and 980 OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile.

Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.

Sacyr has formed a consortium with Samsung C&T Corporation and 3220 Parsons Transportation; ACS through subsidiary 981 Hochtief, has joined forces with 5177 Vinci, Constructora VCGP Chile, and 1021 American Bridge Company; and OHL has formed a consortium with Engineering & Construction and 2579 Mott MacDonald. The five international consortium bidding for the project are led by 3149 Impregilo; 890 China Railway Group; 3366 China Road and Bridge Corporation; 1324 Astaldi; and 1511 OAS of Brazil.

For more information on companies in this article

Related Content

  • Chile-Argentina tunnel project attracts interest
    March 12, 2018
    Interest is strong in the project to build a new tunnel connecting Argentina and Chile. In all 26 firms have entered into the bidding process, joining together to comprise 10 consortia. The project is likely to cost US$1.5 billion, with much of the necessary financing being supplied by the IADB. The consortia include: Astaldi, FCC and Rivas; CCCC and JCR; China Railway Construction and Panedile; Dragados, Techint and Besalco; OHL, Condotte and Rovella; Power China and Sacde; Sacyr Construccion, SK
  • Five consortia interested in Romania’s Pitesti-Craiova highway project
    May 10, 2013
    The Romanian Prime Minister Victor Ponta has revealed that five consortia have entered bids to land the contract for the construction of the €2.08 billion (RON 9bn) 121km Pitesti-Craiova highway. The deadline for the submission of bids was 8 May 2013. Offers were submitted by a consortium formed by Romanian companies such as Spedition UMB, Tehnostrade and Vectra Service. The other four consortia that filed bids are: Obrascon Huarte Lain/OHL ZS (Spain), China Communications Construction Company/Dogus Insaat
  • FCC and ACS of Spain to take part in tender for UK’s Mersey bridge project
    May 22, 2013
    Spanish construction companies FCC and ACS say they will take part in the tender of the US$3.05 billion (£2bn) Mersey bridge project in the UK. FCC and ACS will take part as members of two of the three consortia that have expressed an interest. FCC will take part in the tender through its German subsidiary Hochtief, and it infrastructures division Iridium, within the consortium led by BAM Nuttal of the UK. Meanwhile, ACS will be part of the Bilfinger and Macquarie consortium through its subsidiary Globalvia
  • Chile authorities present US$ 740mn project for Chacao bridge
    May 25, 2012
    Chile public authorities have presented an amended version of the Chacao bridge project, that will link Chiloe island with the mainland. Works for the 2.6km bridge will be assigned through a public competition and will cost up to US$ 740million, over US$ 200million less that the initial project presented by Puente Chiloe. The tender will be launched by the end of 2012 and should be assigned in 2013. The project is due for completion by 2019.