Skip to main content

Spanish firm wins Senegal bridge and highway upgrades

The authorities in Senegal have awarded a US$ 142.6 million package of works to Spanish contractor Isolux. The work involves construction of two stretches of the RN6 highway measuring some 194.5km in total. Also included in the deal is work to the new bridge at Kolda. The project will involve widening, improvement and modification works to the highway. The areas where work will be carried out lie between the Casamance River and the border with Guinea Bissau and in the towns of Kolda and Ziguinchor.
April 10, 2013 Read time: 1 min
The authorities in Senegal have awarded a US$ 142.6 million package of works to Spanish contractor 1392 Isolux. The work involves construction of two stretches of the RN6 highway measuring some 194.5km in total. Also included in the deal is work to the new bridge at Kolda. The project will involve widening, improvement and modification works to the highway. The areas where work will be carried out lie between the Casamance River and the border with Guinea Bissau and in the towns of Kolda and Ziguinchor.

For more information on companies in this article

Related Content

  • Linking Kenya and Uganda with a new road project
    May 10, 2018
    An upgraded road link will improve transport between Uganda and Kenya - Shem Oirere reports Rainfall patterns and type of soil in an agricultural rich area shared by the neighbouring East African countries of Kenya and Uganda was a key consideration in arriving at the decision to upgrade to bitumen standards 73km of the 118km Kapchorwa-Kitale road that links the two countries. Initially, Uganda had proposed to have the road between Kapchorwa and Suam on its border with Kenya re-gravelled and widened to a
  • Denmark’s Roskilde Bridge officially opened
    October 1, 2019
    The official opening of Denmark’s new Roskilde Bridge has been carried out. The structure has been named Crown Princess Mary´s Bridge. The 1.3km structure is the first cantilevered bridge to be built in Denmark since 1970. Construction took 36 months and the work was completed three months ahead of schedule. The project posed some challenges to the engineers and designers as the construction work was subject to environmental restrictions. Because it lies close to a residential area and a summerhouse area,
  • Indian highways road construction
    April 16, 2012
    Superlatives, once applied only to China's phenomenal growth, are now being used for India. Patrick Smith reports Those involved with the Naini Bridge in Allahabad are so proud of the result that they have set up an exhibition centre detailing its construction.
  • Louis Berger wins Mozambique N303 road upgrade consultancy deal
    February 19, 2015
    Infrastructure consultancy Louis Berger is to provide services worth US$7.6 million for the rehabilitation of Mozambique’s National Road N303. The Sub-Saharan Regional Pipeline Corporation awarded the contract for work on the 350km narrow and unpaved carriageway that crosses Tete province. SSRPC is investing $350 million to upgrade the road that starts at the Zambezi River, where Mozambique, Zambia and Zimbabwe have a common border. The modernised road will be the shortest link to a railway under constructi