Skip to main content

Spaghetti Junction reaches 40 year landmark

The famous Spaghetti Junction in Birmingham, central England marks its 40th birthday this week. A firm divider of opinion among the millions of motorists that use it each year, its sprawling concrete arteries at junction six of the M6 connect the A38(M) Aston Expressway into central Birmingham. Officially opened on 24 May 1972, the Gravelly Hill Interchange – Spaghetti Junction’s official name - took four years to build and cost between £9m and £10m. It was subsequently dubbed Spaghetti Junction by newspap
May 21, 2012 Read time: 2 mins
The famous Spaghetti Junction in Birmingham, central England marks its 40th birthday this week.

A firm divider of opinion among the millions of motorists that use it each year, its sprawling concrete arteries at junction six of the M6 connect the A38(M) Aston Expressway into central Birmingham.

Officially opened on 24 May 1972, the Gravelly Hill Interchange – Spaghetti Junction’s official name - took four years to build and cost between £9m and £10m.

It was subsequently dubbed Spaghetti Junction by newspaper reporter, Roy Smith, when he worked on the Birmingham Mail.

Perplexing some motorists, its numerous carriageways, supported by more than 500 concrete columns, follow the line of the local canal and river network on elevated sections.

Motorists voted it the best-known sight seen from UK motorways in an 3443 RAC survey in 2007.

In March this year, visitors to Spaghetti Junction were given the chance to be pushed underneath the interchange as part of an art project.

As part of the two-day Track exhibition created by artist Graeme Miller, people got to on boards and be pushed sideways along a 100m track to see the underside of the Junction’s five different levels of roads above.

After its official opening 40 years ago, coach operators ran sightseeing tours at 65p a head.

For more information on companies in this article

Related Content

  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Highway installation
    February 6, 2012
    In the UK a civil engineering firm is using Wacker Neuson's novel vertical digging system (VDS) on a major contract to up-grade the motorway communication network alongside the M6. The Highways Agency contract involves work along a total of 64km between junctions 32 and 37 and McDermott Construction, together with sister company McFour, has been tasked by main contractor Peek Communications to open a 960mm deep x 410mm wide trench and install large termination boxes every 500m. The job involves bedding four
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.