Skip to main content

SolarLite road studs help slash fatalities on one of Britian's most dangerous roads

More than 304 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place, according to this year's tracking survey by the Road Safety Foundation.
February 29, 2012 Read time: 2 mins
More than 304 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place, according to this year's tracking survey by the Road Safety Foundation. On these 15 roads alone, fatal and serious crashes dropped 62 per cent from 494 to 190. Entitled Simple Measures Save Lives, the report shows that elementary safety measures are paying back the costs of investment in an average of 10 weeks. The savings are worth over US$80 million million annually to emergency services, the NHS, local authority care, businesses and families.

This year's most improved road is an 11km section of the A4128 through Buckinghamshire from Great Missenden to High Wycombe. Over the last two surveys, it has moved from one of Britain's highest risk roads to one of the safest. Over this time, fatal and serious collisions dropped by 89 per cent, from 19 to 2.

This non-primary single carriageway A road is a busy route connecting local villages, and carrying high volumes of commuter traffic. Safety measures put in place include some new speed restrictions; and an innovative use of 2696 Astucia SolarLite solar-powered road studs to improve night-time visibility.

Of the UK's 15 most improved roads, almost half are single carriageways, and are spread across the country. Consultation with road authorities on these sections found that common crash types were single vehicles losing control at bends and rear-end collisions at junctions and during busy periods.

Improvements on the 15 roads include:

    •Signing, markings and the design and layout of junctions
    •Speed limit review and the use of speed enforcement
    •Resurfacing, including the use of high-friction, anti-skid treatments on bends
    •Central safety barriers

On these 15 improved routes, Dr Joanne Hill says: "These are practical, largely inexpensive solutions which will pay back the costs of investment in an average of 10 weeks - a 500 per cent rate of return in the first year alone - and go on saving lives and saving money for the nation for many years to come. Much of this remedial work can be done as part of routine maintenance."

To download a PDF of the 98-page report: Saving Lives, Saving Money - The costs and benefits of achieving safe roads, published by the 3375 Road Safety Foundation, click %$Linker: External 0 0 0 oLinkExternal this link 98-page report: Saving Lives, Saving Money - The costs and benefits of achieving safe roads. http://www.roadsafetyfoundation.org/media/11070/saving%20lives_saving%20money.pdf false false%>.

For more information on companies in this article

Related Content

  • UK’s Annual Local Authority Road Maintenance – ALARM – survey
    June 16, 2017
    Within years, one in six UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM – survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all UK local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Local authori
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    January 6, 2017
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes
  • LTM1750-9.1 all-terrain crane joins Liebherr line-up
    February 7, 2013
    Liebherr has developed the LTM1750-9.1, a nine-axle all-terrain crane with a maximum lift capacity of 750 tonnes. The 52m telescopic boom machine is carried by the machine and offers a 154m maximum lift height, with a maximum working radius of 112m. A luffing fly jib can be added in 3.5m increments to take maximum lift height to 91m. Weighing in at 108 tonnes in transport configuration, the LTM puts down 12 tonnes per axle. However if the machine’s boom supports are removed the crane can travel at 11 tonnes