Skip to main content

Slovakian project under spotlight

Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is k
July 3, 2012 Read time: 2 mins
Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The 1054 European Investment Bank (EIB) and 1166 European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the 2465 European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is keen to sign the contracts for the project, the EC is holding back until the answers are provided. The Slovakian Transport Ministry has said that it may opt to change the route of the controversial section of the Martin- Presov highway to meet requests from the European Commission. Environmental groups have suggested building tunnels but the Transport Ministry says that this would be too expensive. The latest developments mean that the highway may not be completed by 2013 as planned.

Related Content

  • Vehicle emissions strategy
    July 3, 2012
    Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is k
  • Go-ahead for controversial highway
    May 30, 2012
    APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
  • Slovakia’s troubled D1 highway
    February 20, 2012
    Slovakia’s Ministry of Transport is to finance construction work on the 75km section of D1 highway between Martin and Presov from state funds, with work expected to start in the second quarter of 2011.
  • Financial setbacks beset Slovakia’s highway development
    June 12, 2012
    Slovakian highway company NDS says that construction of the 13km Turany-Hubova highway may not be started in 2012. The previous Transport Ministry plan was to call the tender for this stretch in summer 2012. However, the EC has not yet approved the construction of this highway, with questions surrounding the protected area in the Velka and Mala Fatra mountains. If Slovakia does not get this approval, the country might have to chose the second option, which includes the tunnel Korbelka. The EC's decision is