Skip to main content

Slovakian bridge defies high explosives demolition attempt

An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
November 15, 2012 Read time: 1 min
An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction.

The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.

The Transport Ministry is reported to have forbidden the use of WEISE support frameworks in all bridge constructions in Slovakia until the incident in eastern Slovakia is thoroughly investigated. The project was insured for €2million, but the insurance company (6886 Kooperatíva) is reported as wanting to see responsibility assessed before it issues a payment.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ Demolition news false http://www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ false false%>

For more information on companies in this article

Related Content

  • Hidromek has developed a long reach excavator
    January 6, 2017
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Hidromek has developed a long reach excavator
    February 6, 2013
    A new version of Hidromek’s well accepted HMK220LC excavator is being offered with a long reach boom for use in special earthmoving and drainage applications. Called the HMK200LC LR, this machine is designed for fine grading at long reach, as well as for duties such as ditching and drainage clearance. As with the standard machines, Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used. According to export manager Anil Bingöl, this machine widens Hidromek’s standard excavator
  • Bonfiglioli opts for AC/DC electric drum drive for truck mixers
    January 6, 2017
    Bonfiglioli has developed an electric drum drive for the new hybrid truck mixer from CIFA, the concrete equipment specialist owned by Chinese manufacturer Zoomlion. The 500 series drum drive with electric motor offers drum rotation speeds from 15-22rpm and is suited to mixer capacities from 6-14m3. The drivetrain relies on an AC induction motor to turn the drum, which gets its power from an on-board battery pack. The electric drum drive can also be powered by mains electricity – the latter can be plugged in
  • Bonfiglioli opts for AC/DC electric drum drive for truck mixers
    April 18, 2013
    Bonfiglioli has developed an electric drum drive for the new hybrid truck mixer from CIFA, the concrete equipment specialist owned by Chinese manufacturer Zoomlion. The 500 series drum drive with electric motor offers drum rotation speeds from 15-22rpm and is suited to mixer capacities from 6-14m3. The drivetrain relies on an AC induction motor to turn the drum, which gets its power from an on-board battery pack. The electric drum drive can also be powered by mains electricity – the latter can be plugged in