Skip to main content

Slovakian bridge defies high explosives demolition attempt

An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
November 15, 2012 Read time: 1 min
An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction.

The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.

The Transport Ministry is reported to have forbidden the use of WEISE support frameworks in all bridge constructions in Slovakia until the incident in eastern Slovakia is thoroughly investigated. The project was insured for €2million, but the insurance company (6886 Kooperatíva) is reported as wanting to see responsibility assessed before it issues a payment.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ Demolition news false http://www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ false false%>

For more information on companies in this article

Related Content

  • VIDEO: Rollerman Blondeau takes to the hills, Grimsel Pass
    July 26, 2016
    Sure, it’s a spectacular run down a mountain road. But it’s also an extremely visual reminder that highway infrastructure is important for work and play. Let’s not forget that the road - in this case Switzerland’s Grimsel Pass, 2,164m - has to be smooth enough for Jean Yves “Rollerman” Blondeau to reach those speeds without being chucked over edge and down a cliff. The pass is a driver’s delight as it crosses the continental divide in the Alps where rivers flow one way towards the North Sea and the ot
  • Jaws II for Robi demolition grapple
    January 6, 2017
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Jaws II for Robi demolition grapple
    February 3, 2012
    New P-jaws make Ramtec’s Robi DG15RP demolition grapple ideal for recycling applications. The DG grapples are especially designed for light demolition projects such as wooden buildings, bricks, concrete without rebar, and for sorting and loading demolition debris in scrap yards.
  • Plan worth sticking too
    April 8, 2013
    Plan supplies turn-key plants for the manufacture of precast concrete elements for civil, industrial and commercial buildings. The company’s machinery and plants are designed and built with innovative and useful solutions to produce wall panels, columns, beams, roof elements, hollow-core slabs. Plan can also provide special bespoke products on request. The firm’s services also include installation and commissioning, factory design, electrical and mechanical design, operator training, and after-sales service