Skip to main content

Slovakian bridge defies high explosives demolition attempt

An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
November 15, 2012 Read time: 1 min
An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction.

The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.

The Transport Ministry is reported to have forbidden the use of WEISE support frameworks in all bridge constructions in Slovakia until the incident in eastern Slovakia is thoroughly investigated. The project was insured for €2million, but the insurance company (6886 Kooperatíva) is reported as wanting to see responsibility assessed before it issues a payment.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ Demolition news false http://www.demolitionnews.com/2012/11/15/video-stubborn-bridge-refuses-to-fall/ false false%>

For more information on companies in this article

Related Content

  • Cimolai Technology’s customised lifting quality
    March 27, 2013
    Cimolai Technology’s special lifting equipment includes mobile straddle transporters and flat-bed trolleys on tyres, rail gantry cranes, cantilever lifting devices and launching gantries for bridge and viaducts construction. The company is renowned for customised solutions and guarantees worldwide assembly and after-sale service.
  • Doosan’s powerful new compressor suits duties in extraction markets
    January 31, 2013
    Doosan Portable Power is offering its new large 25/280 portable compressor, which meets Stage IIIB/Tier 4 Interim emission regulations. The 25/280 portable compressor has a free air delivery of 28.3m³/min at a rated operating pressure of 25.1bar. Dual pressure regulation is a standard feature of the 25/280 compressor, allowing it to supply compressed air at operating pressures of both 25.1 or 17.2 bar. Dual pressure regulation expands the scope of applications for the 25/280 compressor which includes poweri
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.